A change order shows up as a margin and cash effect immediately, not six weeks later.
For project-driven organisations that want to know which project actually earns money and what that means for liquidity.
What this entry point closes
An entry point is a chain that is manual work today — not a change of systems.
01 · Project event
A delay, a change order, a remaining-cost correction — the record that starts it.
02 · EAC
Remaining cost and estimate at completion, method-consistent and traceable.
03 · Margin
The bridge from as-sold to as-delivered, with a cause per deviation.
04 · Billing
What becomes billable from it, and what does not yet.
05 · Cash
When the money arrives and what is tied up until then.
06 · Forecast
The effect in the liquidity path, not first in the monthly report.
07 · Decision
Who acts, by when, with which expected effect.
08 · Verified result
Expected against actual effect, attributed to the project.
Different afterwards
A change order, a delay or a remaining-cost correction shows up as a margin and cash effect immediately, instead of six weeks later in reporting.
This chain in context See cross-functional finance
How you know this entry point fits
Which domains take part in this chain
Participation, not scope: no domain is taken over by a bundle, and the shared foundation is part of every entry point.
The foundation — finance data fabric, identity and access governance, data lifecycle and records, platform and administration — is not bought separately. Without a shared data model and an enforced permission model, none of the business domains work.
What stays in your systems
No replacement as a precondition. Your systems stay authoritative for transaction, posting and close; FinanceOS connects context, control, decision and evidence across them.
ERP and ledger
Transaction, posting, close.
Banks
Accounts, payments, settlement.
DMS and CLM
Storage, authoring, signature.
PSA and payroll
Project delivery, time capture, payroll.
Five other chains, depending on where you start
What of this chain is verified in the product today
Case, control, evidence
Verified in the product
Case intake, ownership, approval within authority and the evidence record on the item.
Effect verification
Pilot or validation
The last station of the chain against a baseline recorded beforehand.
Full chain depth
In active development
Not every station is equally far along. What holds today is stated on the domain page.
What is not marked, we do not claim.
Maturity per capability is stated on the domain pages. What we can evidence today
Bring two live projects where you cannot state the result with confidence today.
Twenty minutes on those shows whether we connect the right things. Not a demo environment with prepared data, but your constellation.